Start
your
energy
Enerlis, energy audit company
The GTB audit for design excellence
DESCRIPTION OF THE STUDY
PREPARATORY PHASE
Analyzes the operation of existing equipment on the overall multi-level architecture of the system
- Field automaton
- Communication network between field automatons
- Multi-station supervision
ANALYSIS PHASE
Analysis of gaps or malfunctions:
- Equipment (automates, probes, sensors, etc.)
- Software (automation or supervision)
- Features
CONCLUSION AND DELIVERABLES
- Recommendation for improvements, modernization, replacement of the existing
GTB - Validation with the customer of the list of instructions, alarm thresholds, associated procedures).
- Definition of the characteristics of GTB (comfort, security and energy management ).
REPORT AND ACTION PLAN
- Future architecture
- The definition of points per batch ( HVAC , electricity, alarms, counting etc.)
- A provisional work schedule
ENCRYPTION
- Costing of the work
- Calculation of the CEE premium directly deducted from the quote